
Appendix C Installing the Server Into a Rack With Optional Slide Rails C-9
Caution – Verifythat the server is securely mounted in the rack and that the slide-
rails locks are engaged with the mounting brackets before continuing.
C.5 Installing the Cable ManagementAssemblyUse this procedure to install an optional cable management assembly (CMA).
1. Unpackthe CMA parts.
2. Take the CMA to the back of the equipment rack and ensure that you have
adequate room to work around the back of the server.
Note – References to “left” or “right” in this procedure assume that you arefacing
the back of the equipment rack.
3. Locate the CMA rail extension and insert it into the left slide rail until the
extension locks into place with an audible click. (See FIGUREC-7.)
The CMA rail extension might be taped to the CMA assembly.