SUPERSERVER
2-4 Installing the System into a Rack
This section provides information on installing the SuperServer
Identifying the Sections of the Rack Rails
You should have received a total of six rack rail sections with the SuperServer
Refer to Figure
Installing the Chassis Rails
Position the front and rear chassis rail sections along the side of the
Locking Tabs: Both front chassis rails and the rack rails have a locking tab, which serves two functions. The fi rst is to lock the server into place when installed and pushed fully into the rack, which is its normal position. Secondly, these tabs also lock the server in place when fully extended from the rack. This prevents the server from coming completely out of the rack when you pull it out for servicing.