Superior UVFC-600 Canopy Installation, OPTIONAL EQUIPMENT Blower Kit, Blower Kit Installation

Models: UVFR-600 UVFC-600 UVFC-500 UVFR-500

1 12
Download 12 pages 981 b
Page 9
Image 9
Canopy Installation

8d Nail

Figure 9

Note: The nailing flange and the area directly behind the nailing flange is exempt from the clearances described on the firebox clearance label.

Step 5. To safely operate the heater with con- sideration of the mantel clearances the canopy must be installed.

Canopy Installation

The factory-supplied canopy must be installed on the firebox for safe operation. See Figure 10.

UVF-500

Shown

UVF-500

CanopiesFirebox

OPTIONAL EQUIPMENTBlower Kit Installation Opening

Firebox

UVF-600 Opening

Canopies

Attaching

Screws

3 Screws for 500 Models

4 Screws for 600 Models

Figure 10

Step 1. Remove the screws from the top front frame assembly. There are three (3) screws on the 500 models and four (4) screws on the 600 models.

Step 2. Align the canopy with the holes in the top frame.

Step 3. Replace the screws previously removed.

Step 4. Tighten side screws. Make sure the canopy is level and secure.

OPTIONAL EQUIPMENT

Blower Kit

Circulating Models Only

If you are installing one of the blower kits, Models FBK-100 or FBK 200, follow Steps 1 through 5, and see the installation instructions provided with the kit for electrical wiring re- quirements (see Figure 11 ). The firebox must be connected to main power supply at time of installation if a forced air kit is to be installed later. The electrical connections must be made before the firebox is framed and enclosed in the finished walls.

This appliance must be electrically grounded in accordance with local codes or, in the absence of local codes, the national electrical code, ANSI/NFPA 70 - (Latest Edition).

CAUTION: ELECTRICAL CONNECTIONS SHOULD ONLY BE PERFORMED BY A QUALI- FIED, LICENSED ELECTRICIAN. MAIN POWER MUST BE OFF WHEN CONNECTING TO MAIN ELECTRICAL POWER SUPPLY OR PERFORM- ING SERVICE.

Blower Motor

Grounded

to Appliance

Motor Plug

Receptacle

120V

Appliance Junction Box

NOTE: If any of the original wire as supplied must be replaced, it must be replaced with type AWM 105° c – 18Ga. wire

Figure 11

NOTE: DIAGRAMS & ILLUSTRATION NOT TO SCALE.

Blower Kit Installation

To install the blower kit, follow Steps 1 thru 5 and refer to Figures 12, 13 and 14.

Step 1. Locate the blower motor shield.

Step 2. Remove the motor shield by bending it along the perforation until the tabs break away.

Step 3. With the motor shield removed, place the blower in the unit with the power cord up and slide to the back of the unit until the motor is behind the rear support.

Step 4. Rotate the blower 90 degrees, so that the discharge is up.

Step 5. Move left side of blower around until it is in the proper position and bend the retaining tabs in the bottom of the unit up into the slots on the blower.

Blower Motor

Motor Shield

Figure 12

Perforation

Tabs

Manual background Motor Shield Removed

Figure 13

Rotated Blower In Final Position

Figure 14

9

Page 9
Image 9
Superior UVFC-600, UVFR-600, UVFC-500, UVFR-500 Canopy Installation, OPTIONAL EQUIPMENT Blower Kit, Blower Kit Installation