INSTALLING LEDGES
AND PLACEMENT OF WARNING LABELS
SCREW HOLE LOCATION GUIDE
Refer to the "Construction |
| 16x10 | 18x12 | 24x12 | 24x15 | 30x15 | 33x18 | 39x18 | 45x18 | |
beginning of these Instructions as indicated below: |
| OVAL | OVAL | OVAL | OVAL | OVAL | OVAL | OVAL | OVAL | |
FIG. A | (4" Ledge/ 4" Vertical) | 1 | B & D | B & D | B & D | B & E | B & E | B & E | B & E | B & E |
| (6" Ext. Ledge/ 6" Old Ext. Vertical) | 1 | A & D | A & D | A & D | A & D | A & D | A & D | A & D | A & D |
FIG. B | (6" Ledge/ 6" Vertical) | 1 | E & C | E & C | E & C | E & C | E & C | E & C | E & C | E & C |
FIG. C | (6" Ledge/ 6" Vertical) | 3 | E & C | E & C | E & C | E & C | E & C | E & C | E & C | E & C |
FIG. D, E, G & H | (6" Ext. & 7" Ledge/ 6" Box Vertical) | 2 | A & D | A & D | A & D | A & D | A & D | A & D | A & D | A & D |
FIG. F | (9" Ledge/ 8" Box Vertical) | 2 | A & C | A & C | A & C | A & C | A & C | A & C | A & C | A & C |
A |
| A | A | A |
|
|
B | C | C B |
|
| B | B |
|
| C | C | |||
|
|
|
|
| ||
1 D | E | E D | 2 B C D E | E D C B | 3 D E | E D |
16
No. 12 x 1/2”
Sheet Metal
Screw
Place ledges over the wall with each end resting on a top plate. Using the above chart as a guide align the set of holes in the top plate as shown in the above drawing for your size pool with the holes in the ledge and insert the No.12x1/2" Sheet Metal Screw through the ledge and into the top plate. The actual screw holes that are used does not affect the integrity of the pool. You may use the set of holes that line up best!
The ledge screws should not be tightened until all the ledges are in place and the pool has been filled with water.
Special Instructions for pools with 9" Wide Ledges
For pools with a 9" ledge, care should be taken to assemble the ledge along the straight sections of the pool in the manner shown below. Along the straight sections of the pool, use the short ledge sections and attach them to the Buttress Top Plates using the screws and holes illustrated on the left.
INSTALLING LEDGES ON BAR HARBOR
& RIO VISTA MODEL POOLS ONLY
Attention: You must use the 5/16” x 3/4” OD Stainless Steel Washers with each Sheet Metal Screw to secure the top ledges to the top plates. Failure to use the washers may result in damaged ledges.
Place ledges over the wall with each end resting on a top plate. Align the set of holes in the top plate as shown in the instructions for your size pool with the holes in the ledge and insert the No.12x1/2" Sheet Metal Screw through the washer and the ledge and into the top plate.
WARNING
LEDGE
PLACEMENT
Your pool is equipped with (3) three special warning ledges. The (1) one ledge with a large warning on top is to be installed by the entry point into the pool and is not to be obstructed by any object such as your ladder. The (2) two ledges with the warning on the inside are to be placed opposite the entry point into the pool with the warning fac- ing the entry point.
THESE WARNINGS ARE NOT TO BE REMOVED UNDER ANY CIRCUMSTANCES
NOTE: Your pools top ledge was not designed to be a walk around.
Caution everyone who uses your pool NOT TO WALK OR SIT ON THE LEDGE!
If your pool is equipped with feature tape it is best to apply it to the ledges at this time.
20
ENTRY POINT