Quick Setup Guide

2.1 Unpacking

To avoid damage to the unit during transportation, the Management Server is delivered in a special shipping box, which should contain the following components:

ƒUser Manual and other documentation on CD.

ƒRack-ears, screws and screwdriver.

ƒCables:

oPower cable o Ethernet cable

ƒTANDBERG Management Server

Installation site preparations

ƒMake sure that the Management Server is accessible and that all cables can be easily connected.

ƒFor ventilation: Leave a space of at least 10cm (4 inches) behind the Management Server’s rear panel and 10cm (4 inches) in front of the front panel.

ƒThe room in which you install the Management Server should have an ambient temperature between 0ºC and 35ºC (32ºF and 95ºF) and between 10% and 90% non-condensing relative humidity.

ƒDo not place heavy objects directly on top of the Management Server.

ƒDo not place hot objects directly on top, or directly beneath the Management Server.

ƒUse a grounded AC power outlet for the Management Server.

Rack Mounting (optional)

The Management Server comes with rubber feet for standalone installation and brackets for mounting in standard 19” racks.

Before starting the rack mounting please make sure the TANDBERG Management Server is placed securely on a hard flat surface.

1.Disconnect the AC power cable.

2.Make sure that the mounting space is prepared according to the ‘Installation site preparations’ above.

3.Attach the brackets to the Management Server on both sides of the unit.

4.Insert the Management Server into a 19” rack, and secure with screws in the front (four screws).

Introduction

11

Page 11
Image 11
TANDBERG D13939 setup guide Unpacking, Installation site preparations, Rack Mounting optional