19
Models 150, 152, 162, 168 Operating Procedures
031030
Priming
Prime the machine as close as possible to the time of
first product draw.
Step 1
With a pail beneath the door spout, raise the draw
valve. Fill the mix hopper with fresh mix. (Maximum
hopper capacity is 8 quarts [7.6 liters].) Allow the mix
to flow into the freezing cylinder. Thiswill force out any
remaining sanitizing solution. When full strength m ix is
flowing from the door spout, lower the draw valve.
Note: Use only FRESH mix when priming the
freezer.