4 User Functions

IN-SERVICE PATCHING

To temporarily connect an NE or DCS circuit to an alternate DCS or NE circuit on the same or a different DNI-3 panel or DSX without disrupting service, follow the steps below, using the Twist Lok Jacks (TLJs) on the front of the appropriate DNI-3 panels and the following additional equip- ment:

Four Mini-WECO patch cords (Mini-WECO plug at each end)

Two 75-ohm Mini-WECO terminating plugs

One dual bridging office repeater (BOR), or two single BORs

Step Action

1.Using one Mini-WECO patch cord:

a.Insert the plug of one end into BOR position 1, INPUT.

b.Insert the plug of the other end to the monitor TLJ at the first lo- cation.

2.Using a second Mini-WECO patch cord:

a.Insert the plug of one end into BOR position 1, OUTPUT.

b.Insert the plug of the other end into the IN TLJ at the second lo- cation.

3.Using a third Mini-WECO patch cord:

a.Insert the plug of one end into BOR position 2, INPUT.

b.Insert the plug of the other end into the monitor TLJ at the sec- ond location.

Issue A Rev 2

108469

Telect, Inc.

4-1