Percent Paramagnetic Oxygen Analyzer Part I: Control Unit

Part I: 3-1

Teledyne Analytical Instruments
Installation
Installation of Model 3010MB Analyzers includes:
1. Unpacking, mounting, and interconnecting the Control Unit and
the Analysis Unit
2. Making gas connections to the system
3. Making electrical connections to the system
4. Testing the system.
This chapter covers installation of the Control Unit. (Installation of the
Analysis Unit is covered in Part II of this manual.)

3.1 Unpacking the Control Unit

The analyzer is shipped with all the materials you need to install and
prepare the system for operation. Carefully unpack the Control Unit and
inspect it for damage. Immediately report any damage to the shipping agent.

3.2 Mounting the Control Unit

The Model 3010MB Control Unit is for indoor/outdoor use in a general
purpose area. This Unit is NOT for any type of hazardous environments.
The standard model is designed for indoor/outdoor mounting. Figure 3-
1 is an illustration of a Model 3010MB standard Control Unit front panel
and mounting brackets located-two at the top and two at the bottom of the
units frame.