GAS AND ELECTRICAL HOOK-UP

With the unit inside of the enclosure, connect the gas supply hose to the manual shut-off valve and open valve. Check the connection points at the shutoff valve for any leaks and repair prior to installation of the unit. Connect the power supply cord to the electrical supply outlet.

Bottom of Unit

Leak Test Points

Check hose

 

for signs of

 

abrasions, cracks

Test Leak Points

or leaks

 

 

LP Tank

Figure 12

Figure 13

Page 11