Thermador VCI2 Service, Install Housing, Install the Unit, Final Steps Test The Installation

Models: VCI2

1 28
Download 28 pages 57.13 Kb
Page 8
Image 8
Install Housing

Service

 

Install Housing

See “General Information” on page 3 for recommended installation height and

 

“Mounting Requirements” on page 4 for information on mounting specifications.

 

Install housing as directed by the manufacturer.

Connect to Ductwork Connect Electric

Install the Unit

Connect ventilation unit to ductwork in house.

Plug electrical cord into grounded outlet. Before you plug in an electrical cord, be sure all controls are in the OFF position.

Press unit up into housing until plastic clips on front and rear snap into the hous- ing. Install 4 screws through tapholes into housing.

Figure 9: Install the Unit

Final Steps

Test The Installation

Install Filters. See Use and Care manual for detailed instructions.

Test the operation of the blower and the lights.

Note: Be sure to check for backdraft. With the blower on high, close the windows and doors to the area to ensure that fan does not cause back drafting in any outlet vent for another appliance.

Service

Before Calling Service

Product Data Plate

See Use and Care Manual for troubleshooting information. Refer to the Warranty in the Use and Care Manual. Please be prepared with the information printed on your product data plate when calling.

The data plate shows the model and serial number. It is located under the filter.

English 6

Page 8
Image 8
Thermador VCI2 Service, Install Housing, Install the Unit, Final Steps Test The Installation, Product Data Plate