1. Installation of drain-up kit body (See Fig. 1.)

Open the cover of drain-up kit body, align the position and fasten the body using the attached 4 tapping screws.

2. Hose connection (See Fig. 1.)

• First connect the drain hose to pipe at the drain port of the drain up kit,

and then connect it to the drain port of the air conditioner body.

Tighten the both ends of the drain hose with hose band. In this time, be

P.C. board

To drain up

Cable

CN030

(RED)

CN068 CN030

(BLUE) (RED)

3

1

3

1

3

1

3

1

Drain pump

(DP)

Float switch

(FS)

WARNING

Ask the qualified installation professional to install the drain up kit.

If drain up kit is inappropriate installed by yourself, it may cause a water leak, an electric shock fire and so on.

Install the drain up kit surely according to this installation manual.

When re-install the drain up kit, also ask the qualified installation professional to install it.

If drain up kit is installed by yourself, it may cause a water leak, an electric shock fire and so on.

Configuration

 

sure to set the screw section of the hose band toward upper side.

Apply thermal insulation the drain hose with the attached thermal

 

insulation pipe.

 

Set the both ends of the drain hose closely to the drain pan.

If a gap is generated on the matched section of the thermal insulation

 

materials at the both ends, seal the section by winding the thermal

 

insulation tape.

3. Drain piping

Be sure to set the drain pipe from the drain up kit with falling gradient. Support and fix the drain pipe at an appropriate position so that an excessive load is not applied on the drain port.

Be sure to apply thermal insulation (procured locally) to the drain pipe.

<Fig. 1>

Air conditioner body

Drain up kit

 

Arrange the cables so that they do not apply

a tension upon the

drain-up kit body and the connector section.

CN068 (BLUE)

Test run

Condition check of water drain

After the electric work and cabling work, check the drain is smoothly discharged by running the air conditioner in COOL mode.

If the cooling operation does not continue for a long time, pour water into the drain pan of the air conditioner body to check whether the drain is smoothly discharged or not.

Check there is no water leak at each connecting section.

71

 

Name

Q’ty

 

Name

Q’ty

A

Drain up kit body

1

E

Bundling band

3

 

 

 

 

 

 

B

Drain hose

1

F

Tapping screw

4

 

 

 

 

 

 

C

Hose band

2

G

Thermal insulation tape

2

 

 

 

 

 

 

D

Thermal insulation pipe

1

 

 

 

Drain outlet

Discharge duct

Check lid

30

Mounting screws

(4 pcs.)

 

 

 

Electric

parts box

Cable

Operation check of float switch

During cooling operation, operate the float switch.

Check the air conditioner stops the cooling operation under condition that the drain pump keeps operating.

After operation in COOL mode, operate the float switch.

In this time, check that the drain pump works to discharge the drain.

CD

A B

E F

Drain pan (Drain port)

Drain hose,

thermal insulation pipe

Drain inlet (Drain port)

Suction panel

<Position of float switch>

Float switch

35

To handle the float switch, remove the front panel of the kit and push up the floating section of the float switch with a screwdriver, etc.

Be careful not to operate the float switch consecutively for 2 minutes or more because the air conditioner stops abnormally.

G

REQUIREMENT

Be sure to install the drain up kit correctly according to the procedure described in this Installation Manual. Otherwise, the position of the drain pan on the drain up kit does not match with one on the air conditioner body, resulting in a water leak.

Check the level of the air conditioner.

(Check that it is horizontally set or the drain port side of the air conditioner is set with an inclination within 1˚ downward.)

Be sure to make a check port to the lower ceiling part of the drain up kit.

*Using the hose band, tighten the drain port and drain inlet of the drain pan. Also, be sure to set the screw section of the hose band toward upper side.

4. Cabling (See Fig. 2.)

Remove cover of the electric parts box of the air conditioner body.

Insert 3P connector (BLUE) of the drain up kit into the terminal No. CN068 (BLUE) in the electric parts box.

Remove the short circuit connector (No. CN030) on the P.C. board in electric parts box.

Insert 3P connector (RED) of the drain up kit into the terminal No. CN030 (RED) (Short-circuit connector is not used.)

Clamp the cable in the electric parts box.

Maintenance/Check

In order to put the function of the air conditioner and the drain-up kit fully to practical use, the regular maintenance and check are necessary, together with correct usage.

For the air conditioner body and the drain-up kit especially, check dirt of the drain pan once per year before cooling season and clean them if dirt is heavy.

It is recommended to make a contract with the customers for maintenance and check.

EH99824201 (EN)

Page 74
Image 74
Toshiba RAV-SM1100UT-E, RAV-SM1400UT-E service manual Drain-up Kit For Concealed Duct Type Indoor Unit

RAV-SM1400UT-E, RAV-SM1100UT-E specifications

Toshiba has consistently been recognized for its commitment to innovation and quality in the HVAC market, and the RAV-SM1100UT-E and RAV-SM1400UT-E models exemplify this dedication. These inverter air conditioners are designed to provide efficient cooling and heating solutions for diverse applications, ensuring comfort in both residential and commercial spaces.

One of the standout features of the RAV-SM1100UT-E and RAV-SM1400UT-E is their advanced inverter technology. This technology allows the units to adjust their cooling and heating capacities based on the real-time conditions, leading to significant energy savings compared to traditional fixed-speed systems. The inverter allows for smooth operation at varying speeds, reducing energy consumption while maintaining a consistent indoor climate.

Both models offer exceptional efficiency ratings. With a high energy efficiency ratio (EER) and seasonal energy efficiency ratio (SEER), these units are designed to operate sustainably while delivering powerful performance. The RAV-SM1100UT-E offers a cooling capacity of 11 kW, while the RAV-SM1400UT-E boasts a more robust 14 kW, making them suitable for a range of spaces from smaller offices to larger commercial properties.

Another significant characteristic is their quiet operation. Toshiba has engineered these units to minimize noise levels, ensuring a tranquil environment. This is particularly beneficial in settings like hotels, restaurants, and workplaces where noise can be disruptive.

The RAV-SM series is also equipped with intelligent control technology. This feature allows users to manage the system from anywhere using a smartphone app, providing convenience and flexibility. Integration with smart home systems further enhances usability, making it easy to program schedules and adjust settings remotely.

Additionally, both models employ a variety of robust filtration systems, ensuring that the circulated air is clean and healthy. With filters that capture dust, allergens, and other particles, these units contribute to improved indoor air quality.

Durability is another hallmark of Toshiba's design philosophy. These air conditioners are built with high-quality materials, ensuring long-lasting performance and reliability even in demanding environments. The RAV-SM models are also designed to work efficiently in low outdoor temperatures, extending their usefulness throughout the year.

In summary, the Toshiba RAV-SM1100UT-E and RAV-SM1400UT-E air conditioners represent a fusion of innovation, efficiency, and user-centric design. With their advanced inverter technology, energy efficiency, quiet operation, intelligent controls, and durable construction, they stand as ideal solutions for those seeking effective climate management in their spaces.