Final Tubing Check

Outdoor Unit

Triple Evacuation Method chart

EVACUATE

BREAK VACUUM WITH DRY NITROGEN

WAIT

EVACUATE

BREAK VACUUM WITH DRY NITROGEN

WAIT

EVACUATE

CHECK FOR TIGHT, DRY SYSTEM

(IF IT HOLDS DEEP VACCUM)

RELEASE CHARGE INTO SYSTEM

Final Tubing Check

IMPORTANT:

Check to be certain factory tubing on both indoor and outdoor unit has not shifted during shipment. Ensure tubes are not rubbing against each other or any sheet metal. Pay close attention to feeder rubes, making sure wire ties on feeder tubes are secure and tight.

Installation Manual

Open service valves

Open or close the valve.

Liquid and gas side

Open the valve with a 4 mm hexagon wrench.

[Hexagonal wrench is required.]

 

 

 

 

 

 

)

 

 

 

 

 

 

m

 

 

 

 

 

m

 

 

 

 

4

 

 

 

 

(

 

 

 

 

 

 

 

 

6

 

 

 

 

1

 

 

 

 

 

.

 

 

 

 

 

 

0

 

 

 

 

 

 

While the valve is fully opened, after the screwdriver has reached the stopper, do not apply torque exceeding 4 ft•lbs (5 N•m). Applying excessive torque may damage the valve.

Valve handling precautions

Open the valve stem until it reaches the stop. It is unnecessary to apply further force.

Securely tighten the cap with a torque wrench.

Cap tightening torque

Valve size

Ø1/4” (6.4 mm)

10 - 13 ft•lbs (14 - 18 N•m)

 

 

Ø1/2” (12.7 mm)

24 - 31 ft•lbs (33 - 42 N•m)

 

 

 

 

Charge port

10 - 13 ft•lbs (14 - 18 N•m)

 

 

 