15
Gigabit Dual-WAN VPN Router
Connection
Note:
The console port is the first port on the right of th e front panel.
■
Please keep the device power off when you plugging the console cable.
■
Do not connect the console port with other por ts by RJ45 cable.
■
Verify Installation212 After completing the installation, please verify the foll owing items:
There are 5~10cm of clearance around the side s of the device for ventilation and
■
the air flow is adequate.
The voltage of the power supply meets the requirement of the input voltag e of the device.
■
The power socket, device and rack are well grounded.
■
The device is correctly connected to other net work devices.
■
Power On214 Plug in the negative connector of the provided p ower cord into the power socket of the
device, and the positive connector into a power outlet as the following figure shown.
Connecting to Power SupplyFigure 4-3
Note: The gure is to illustrate the applic ation and principle. The power plug you get
from the pa ckage and th e socket in your situation will comply with the regulation in
your country, so they may differ from the gure above.
Initialization214 After the device i s powered on, it b egins the Power-On Self-Test. A series of tests run
automatically to ensure the device functions prope rly. During this time, its LED indica-
tors will respond as follows:
The Power LED lights on all the time.
■
All LEDs except PWR LED flashes momentarily and then turns of f.
■
The SYS LED flashes every second continuously, which means the initialization is f inished.
■