Installer’s Guide
MOUNTING HOLE LOCATION |
NOTE: ALL DIMENSIONS ARE IN MM (INCHES). |
NOTE: |
For model base size, |
see table on page 7. |
From Dwg. 21D152989 Rev. 0 |
CHECKOUT PROCEDURE
After installation has been completed, it is recommended that the entire system be checked against the following list:
1. | Refrigerant Line, Leak checked | [ | ] |
2. | Suction Lines and Fittings properly insulated | [ | ] |
3. | Have all Refrigerant Lines been secured and |
|
|
| isolated properly? | [ | ] |
4.Have passages through masonry been sealed? If mortar is used, prevent mortar from coming
| into direct contact with copper tubing | [ | ] |
5. | Verify tightness of all electrical connects | [ | ] |
6. | Observe outdoor fan during on cycle for clearance |
|
|
| and smooth operation | [ | ] |
7. | Indoor coil drain line drains freely. Pour water |
|
|
| into drain pan | [ | ] |
8. | Supply registers and return grilles open and |
|
|
| unobstructed | [ | ] |
9. | Return air filter installed | [ | ] |
10. | Thermostat thermometer is accurate. Check |
|
|
| against a reliable thermometer. Adjust per |
|
|
| instructions with thermostat | [ | ] |
11. | Is correct speed tap being used? |
|
|
| (Indoor blower motor) | [ | ] |
12. | Operate complete system in each mode to |
|
|
| insure safe operation | [ | ] |
Trane |
|
|
|
| |
A business of | Trane has a policy of continuous product and product data improvement and it reserves the right to change | |
American Standard Companies | ||
www.trane.com | design and specifications without notice. |
P.I. 9/06