II. RECEIPT INSPECTION | III. INSTALLATION (cont’d) |
All Traulsen products are factory tested for performance | III. a – LOCATION & CLEARANCE (cont’d): |
and are free from defects when shipped. The utmost |
|
care has been taken in crating this product to protect |
|
against damage in transit. Casters or legs are boxed |
|
inside to prevent damage. |
|
Upon delivery carefully inspect your Traulsen unit for |
|
shipping damage. If any is detected, note it on the |
|
carrier’s Bill Of Lading and save all the crating |
|
materials. File a freight claim immediately. If concealed |
|
damage is discovered at installation, contact the |
|
carrier and file a freight claim then. Under no |
|
circumstances may any damaged unit(s) be returned |
|
to Traulsen without proper prior authorization. |
|
III. INSTALLATION |
|
NOTE: If the unit is installed or stored near any incomplete concrete or tile work see the note at the end of section VI.b
III.a – LOCATION & CLEARANCE:
Select a location for your Traulsen VPS unit away from extreme heat or cold. These units are designed to operate in an environment of 86°F (30°C) or less.
Locate the unit so that air drafts (such as heat, A/C or ventilation) do not blow on or over the rail area.
The condensing unit of your Traulsen VPS unit MUST have adequate air circulation. Therefore, do not store anything within of 31” of the condensing unit louvers (located on the unit front). Allow enough clearance between the unit and the side wall so that the doors may open a minimum of 90°. Standard rail models require at least
Fig. 1 Section View - Standard Rail Models
Fig. 2 Section View - Jumbo Rail Models
III.b - POWER SUPPLY:
WARNING
Electrical Shock Hazard
Do not remove ground prong
Do not use an adapter or extension cord
Plug only into a
grounding receptacle
This unit requires a dedicated circuit and
Model | NEMA Receptacle |
Number | Required |
VPS48 | |
VPS54 | |
VPS66 | |
VPS72 | |
VPS90 | |
VPS114 | |
VPS120 |
Verify the supply voltage prior to installation. Do not plug the unit in before reading this entire manual.
III.c - PACKAGING:
Traulsen VPS units are shipped from the factory on a wooden pallet and protected by a crate. Remove the crate but leave the unit secured to the pallet until it reaches its final location. Remove (4) lag screws that secure the unit to the pallet. Lift and support the unit