Tripp Lite SREXTENDER owner manual Preparation continued, Frame Assembly, 48/42U

Models: SREXTENDER

1 7
Download 7 pages 3.32 Kb
Page 2
Image 2
Preparation (continued)

Preparation (continued)

Parts List (If any parts are missing, contact Tripp Lite.)

Note: The hinge swivels H and 12 hinge swivel screws L are pre-installed in the vertical sections A through D .

 

Lower Left Vertical Section (1)

 

1U Blanking Panels (3)

A

G

 

Lower Right Vertical Section (1)

 

Hinge Swivels (6 - all pre-installed)

B

H

 

Upper Left Vertical Section (1)

 

Hinges (4)

C

I

 

Upper Right Vertical Section (1)

 

Cable Manager Brackets (2)

D

J

 

Top Section (1)

 

M6 x 12 mm Flat-Head Screws (8)

E

K

 

Bottom Section (1)

 

M6 x 12 mm Pan-Head Screws

F

L

and Washers (14 total - 12 pre-installed)

MM5 x 10 mm Pan-Head Screws and Washers (40)

NGrounding Cable (1)

OM5 x 20 mm Pan-Head Screws and Washers (4)

PM4 x 8 mm Pan-Head Screws and Washers (8)

A

 

B

 

C

 

D

 

E

 

H

 

K

 

N

F

I

O

 

L

 

 

G

J

M

P

 

 

 

1 – Frame Assembly

Note: For 25U enclosures, you will use only the lower vertical sections For 48U and 42U enclosures, you will use all four vertical sections.

1-1(For 25U enclosures, skip this step.) Slide the lower left vertical

section A inside the upper left vertical section C as shown. Repeat for the lower right vertical section B and the upper right vertical section D . The vertical sections are not interchangeable, so refer to the diagram to confirm that you’re assembling the correct sections.

Aand B . You will not use the upper vertical sections C and D .

48/42U

C1 – Frame Assembly

48/42UD

AManual background

Manual backgroundB

1-1

2

Page 2
Image 2
Tripp Lite SREXTENDER owner manual Preparation continued, Frame Assembly, 48/42U