![](/images/new-backgrounds/1008539/85393x1.webp)
Preparation (continued)
Parts List (If any parts are missing, contact Tripp Lite.)
Note: The hinge swivels H and 12 hinge swivel screws L are
| Lower Left Vertical Section (1) |
| 1U Blanking Panels (3) |
A | G | ||
| Lower Right Vertical Section (1) |
| Hinge Swivels (6 - all |
B | H | ||
| Upper Left Vertical Section (1) |
| Hinges (4) |
C | I | ||
| Upper Right Vertical Section (1) |
| Cable Manager Brackets (2) |
D | J | ||
| Top Section (1) |
| M6 x 12 mm |
E | K | ||
| Bottom Section (1) |
| M6 x 12 mm |
F | L |
and Washers (14 total - 12
MM5 x 10 mm
NGrounding Cable (1)
OM5 x 20 mm
PM4 x 8 mm
A |
| B |
| C |
| D |
| E |
| H |
| K |
| N |
F | I | O |
| L | |
|
|
G
J | M | P |
| ||
|
|
1 – Frame Assembly
Note: For 25U enclosures, you will use only the lower vertical sections For 48U and 42U enclosures, you will use all four vertical sections.
section A inside the upper left vertical section C as shown. Repeat for the lower right vertical section B and the upper right vertical section D . The vertical sections are not interchangeable, so refer to the diagram to confirm that you’re assembling the correct sections.
Aand B . You will not use the upper vertical sections C and D .
48/42U
C
D
A
B
2