TEST PROCEDURES
SPEED SENSOR TEST
This test is used to verify sensor operation in conditions of speed fluctuation, E2: Cal error, S4:
Sensor error, E2: Overspeed error or Unsuccessful Calibration.
455 Treadmill
Set voltmeter to volts DC. Treadmill power on and speed at 0 mph Attach voltmeter leads across outside 2 contacts at J1 on PWM With magnet in front of sensor, 0 VDC
With no magnet in front of sensor, 5 VDC
Check the sensor on every magnet, adjust sensor until voltage shows
In calibration mode before pressing Start, the tread belt can be moved manually and the Met light will blink when a magnet is in front of the sensor.
VOLTAGE TO DRIVE MOTOR TEST
This test is used to diagnose conditions of NO Belt Movement, or Speed Fluctuations
Set voltmeter to volts DC and adjust speed on Control Panel to 4 mph Attach red voltmeter lead to MTR1 on PWM with motor wires attached Attach black voltmeter lead to MTR2 on PWM with motor wires attached 0 VDC signals no PWM output
166 VDC signals open circuit in motor or motor connection Operating voltage will lay between 0 VDC and 166 VDC
NOTE: The reason that we do not narrow down PWM output voltage is that the PWM output is a pulse signal. The sampling rate of the voltmeter used will determine what output voltage the voltmeter is able to read.
Support Services | Fax: | |
|
|
|
Page 18