True Manufacturing Company GDIM-26 Electrical Instructions, Sealing Cabinet To Floor, Step

Models: GDIM-26 GDIM-26NT GDIM-49

1 20
Download 20 pages 42.97 Kb
Page 11
Image 11
ELECTRICAL INSTRUCTIONS

True Food Service Equipment, Inc.

INSTALLATION / OPERATION INSTRUCTIONS

ELECTRICAL INSTRUCTIONS

Step 5

A.Before your new unit is connected to a power supply, check the incoming voltage with a voltmeter. If anything less than 100% of the rated voltage for operation is noted, correct immediately.

B.All units are equipped with a 7 ft. (2.1m) service cord, and must be powered at proper operating voltage at all times. Refer to cabinet data plate for this voltage.

True requires that a sole use circuit be dedicated for the unit. Failure to do so voids warranty.

WARNING

Compressor warranties are void if compressor burns out due to low voltage.

WARNING

Power supply cord ground should not be removed!

NOTE

To reference wiring diagram - Remove front louvered grill, wiring diagram is positioned on the inside cabinet wall.

SEALING CABINET TO FLOOR

Step 1 - Position Cabinet

Allow three inches between the wall and rear of the GDM freezer for proper ventilation.

Step 2 - Level Cabinet

Cabinet should be level, side to side and front to back. Place a carpenter’s level in the interior floor in four places:

A. Position level in the inside floor of the unit near the doors. (Level should be parallel to cabinet front). Leve cabinet.

B. Position level at the inside rear of cabinet. (Again level should be placed parallel to cabinet back).

C. Perform similar procedures to steps a & b by placing the level on inside floor (left and right sides - parallel to the depth of the cooler). Level cabinet.

Step 3

Draw an outline on the base on the floor.

Step 4

Raise and block the front side of the cabinet.

Step 5

Step 6

Raise and block the rear of the cabinet

Step 7

Apply sealant on floor as outline in Step 5. on other three sides.

Step 8

Examine to see that cabinet is sealed to floor around entire perimeter.

Note:

Asphalt floors are very susceptible to chemical attack. A layer of tape on the floor prior to applying the sealant will protect the floor.

NSF Approved Sealants:

1.Minnesota Mining #EC800 Caulk

2.Minnesota Mining #EC2185 Caulk

3.Minnesota Mining #EC1055 Bead

4.Minnesota Mining #EC1202 Bead

5.Armstrong Cork - Rubber Caulk

6.Products Research Co. #5000 Rubber Caulk

7.G.E. Silicone Sealer

8.Dow Corning Silicone Sealer

Apply a bead of “NSF Approved Sealant”, (see list below),To floor on half inch inside the outline drawn. The bead must be heavy enough to seal the entire cabinet surface when it is down on the sealant.

9

www.truemfg.com

9

Page 11
Image 11
True Manufacturing Company GDIM-26 Electrical Instructions, Sealing Cabinet To Floor, Position Cabinet, Level Cabinet