user manual

TCS series

Rigging Instructions for a 2-wide TCS-56/59 array

Parts required: 2 x TCS-56 or TCS-59 enclosures

1 x TP-55/2 flying assembly top plate

1 x BP-55/2 flying assembly bottom plate

4 x M10 x 36mm shoulder eyebolts

4 x M10 x 36mm hex head bolts

8 x flat washers

8 x spring washers

1.Set the cabinets out on the floor with the approximate desired horizontal splay angle.

2.Remove the countersunk screws from the rigging points on the top of the cabinets.

3.Set the TP-55/2 flying assembly top plate on the cabinets, aligning the slots with the enclosure rigging points.

4.Assemble the top plate to the cabinets using M10 x 36mm eyebolts on the outer rigging point on each cabinet, and M10 x 36mm hex head bolts on the inner rigging point on each cabinet.

5.Set the cabinets to the desired horizontal angle using the indented positions on the top plate. As a starting point this will generally be 0° between cabinets (tight packed) in the case of the TCS-56, and 30° between cabinets in the case of the TCS-59.

6.Invert the array and attach the BP-55/2 bottom plate to the bottom of the cabinets by removing the countersunk screws and replacing them with M10 x 36mm hex head bolts.

7.Make final adjustments to the angle between cabinets in order to achieve the best coverage from the array. Tighten all hardware and prepare to lift the array into position.

8. Downward inclination of the completed array can be set using the eyebolts attached to the rear rigging points on the TCS-56/59 cabinets.

9.Attach safety chains to the holes at the rear of the flying assembly top plate.

tcs manual page 24

Page 24
Image 24
Turbosound TCS SERIES USER user manual Rigging Instructions for a 2-wide TCS-56/59 array