Assembly Step 2

Locate these parts:

4 Legs

Cabinet

 

 

Assembly

Hardware:

HARDWARE BAG A

1/4-20 x 5/8” Bolts

16Required

1.Set the cabinet assembly top side down.

2.For each leg, line up the holes

and insert the bolts. Nuts are pre-welded to the cabinet.

IMPORTANT: One leg

 

contains an extra hole

 

on its side and must be

Leg with

mounted at the front in

extra hole

the position shown.

 

This hole will later be

 

used to secure the

 

gas hose to the leg

 

with a zip-tie.

 

3.DO NOT yet insert the two bolts in the locations indicated. These two bolts will be used in the next assembly step.

Tools needed:

Phillips Head

Screwdriver

7

Page 7
Image 7
Vermont Casting 3605G, 3405GW, 3405GT, 3405BGW, 2505G, 3005G owner manual Important One leg