Vermont Casting 7PDVS manual Operation of the DV Power Vent System, Maintenance, 10003262

Models: 7PDVS

1 24
Download 24 pages 59.63 Kb
Page 15
Image 15
Operation of the DV Power Vent System

DV Power Vent System

Operation of the DV Power Vent System

Turn the switch ON/OFF or the wall thermostat, to the ON position.

Blower will start immediately and will purge the unit and the vent system for 45 seconds. At that point, the pilot will light and the main burner(s) will follow.

When the switch ON/OFF or the wall thermostat, is turned to OFF, the main burner and the pilot will shut-down immedi- ately and the blower will run for 45 seconds to clear the flue gases before turning OFF.

If the unit is ON but the flame is unstable (ON and OFF continuously), turn the switch to the OFF position and call a serviceman to check the installation.

Maintenance

The DV Power Vent System box is a maintenance free system. The motor bearings are pre-lubricated for extended life and no further lubrication is required.

It is recommended however to have the system checked once a year by a qualified professional.

10003262

15

Page 15
Image 15
Vermont Casting 7PDVS manual Operation of the DV Power Vent System, Maintenance, 10003262