Vermont Casting ANSI Z83.7-2000, CSA 2.14-2000 Unpacking, must be used without alteration

Models: ANSI Z83.7-2000 CSA 2.14-2000

1 14
Download 14 pages 40.55 Kb
Page 5
Image 5
UNPACKING:

UNPACKING:

1. Remove heater from carton.

2. Remove all protective packing applied to heater for shipment.

3. Retain cartons and packaging material until unit is operated and found in good condition.

4. Checker heater for any shipping damage. If heater shows any external or internal damage, promptly inform dealer/distributor where you purchased heater.

INFORMATION ON SIZE * CAPACITY OR PROPANE GAS CYLINDERS: The chart below shows the number and size of propane tanks needed to run this heater. *Less gas is vaporized at lower temperatures.

You may need two or more 100 pound tanks or one larger tank in colder weather.

Temperature (°F) At

 

Number of Tanks

 

 

 

 

40,000 BTU/h-

 

 

tank

100,000 BTU/h

150,000 BTU/h

 

50,000BTU/h

 

 

 

 

 

 

 

Above 32°F

1 - 20lb

1 - 100lb

1 - 100lb

 

 

 

 

32°F

1 - 20lb

1 - 100lb

2 - 100lb

 

 

 

 

20°F

1 - 20lb

2 - 100lb

3 - 100lb

 

 

 

 

10°F

1 - 20lb

3 - 100lb

3 - 100lb

 

 

 

 

-10°F

2 - 20lb

Use Larger Tank

Use Larger Tank

 

 

 

 

-20°F

1 - 100lb

Use Larger Tank

Use Larger Tank

(See the parts list for your model of heater to get the specified regulator assembly.)

The propane (LP) gas tank must also be equipped with the following:

• A collar to protect the Propane gas valve.

• A shutoff valve terminating a Propane gas cylinder valve outlet as specified in the American National Standards for Compressed Gas Cylinder Valve Outlets and Inlet Connections.

• A safety relief valve having direct communications with the vapor space of the tank.

• An arrangement of vapor withdrawal.

The propane (LP) gas pressure regulator and hose assembly supplied with this heater

must be used without alteration.

The hose assembly shall be visually inspected prior to each use of the heater. If it is evident that there is excessive abrasion or wear, or the hose is cut, it must be replaced prior to the heater being put into operation. The replacement hose assembly shall be that specified by the manufacturer. (See page 11, Part number 42)

Page 4

Page 5
Image 5
Vermont Casting ANSI Z83.7-2000, CSA 2.14-2000 instruction manual Unpacking, must be used without alteration