Viking AF/AR manual Performance Checklist

Models: AF/AR

1 26
Download 26 pages 3.84 Kb
Page 25
Image 25
Performance Checklist

25

26

Open door. Display should flash.

Press “ACTIVATE CONTROLS” button pad and close

 

door.

 

Note: There is a 6 minute delay before the unit starts.

Performance Checklist

h Verify cabinet size.

h Verify electrical supply and water supply (if applicable).

h Install anti-tip device(s) and verify unit is secure.

h Position unit in cutout, level at desired height, and secure unit.

h Plug-in unit and verify operation.

h Connect water supply (if applicable).

Verify icemaker fill tube is properly inserted.

Verify icemaker bailarm is down.

Verify dispenser operation (if applicable).

h Align/square door(s).

h Verify drain pan is properly installed and there are no leaks in water connection.

h Install kickplate.

h Remove internal packaging and labels and wipe unit down.

Installer’s information:

Installer’s Name:_____________________________

Installer’s Company:_________________________

Date: ________________________________________

49

50

Page 25
Image 25
Viking AF/AR manual Performance Checklist