Vision Fitness ST730 manual E P 7 B L a C K B a G

Models: ST730

1 28
Download 28 pages 33.03 Kb
Page 15
Image 15

S T E P 7 B L A C K B A G

Q06

AC2

C09

Q05

Q04

Q03

B11

B09

Loosely attach each of the two shield mounting brackets (B11) to the underside of the overhead lat arm (AC2) with two bolts (M5x10), two lock washers (5.1x9.3x1.3), and two flat washers (5.3x10x1)

Align holes in rear shield (QO3) with the holes in the brackets (BO9 & B11) on the back side of the weight stack; loosely secure using 8 bolts (M5x10). Take the left (QO1) and right (QO2) side shields and repeat on front side of weight stack tower using five bolts (M5x10) for each shield. Tighten all bolts.

Loosely mount the left (QO5) and right (QO6) covers to the brackets (C09) on the overhead lat arm (AC2) using three bolts (M5x10) and three flat washers (5.3x10x1) on each shield. Place the front shield (QO4) on front and mount using eight bolts (M5x10) and eight flat washers (5.3x10x1). The center holes on each side need a flat washer (5.3x10x1) and a nut (M5) attached on the inside of the shield. Tighten all bolts.

Q02

Q01

15

Page 15
Image 15
Vision Fitness ST730 manual E P 7 B L a C K B a G