Vision Fitness ST730 manual E P 1 Orange BAG, AT3 AT2 AT1

Models: ST730

1 28
Download 28 pages 33.03 Kb
Page 9
Image 9

S T E P 1 ORANGE BAG

C05

AG1

AT3

AT2

AT1

NOTE: It is recommended that all bolts in Steps 1 thru 4 are loosely fastened . Tighten all hardware at the conclusion of Step 4

With the flat side down, place the left foot support (AT2) up against the main floor support (AT1), aligning the three holes along bottom of both pieces. Place three bolts (M10x72) and three flat washers (10.2x22x2) through left foot support and main floor support. Take right foot support (AT3) and slide onto bolts sticking out other side of main floor support (AT1). Place a flat washer (10.2x22x2) on each bolt, and partially thread one nylon nut (M10) on each bolt. Do not place bolts through other remaining holes until next step!

Stand the upright frame (AG1), placing the end with four holes in the broad side, into the remaining slot between the left and right foot supports. Make sure the rollers on the upright are facing the seat support. Use four bolts (M10x72), eight flat washers (10.2x22x2), and four nylon nuts (M10) to secure the upright.

Attach a bracket (C05) to each side of the upright frame (AG1) with two bolts (M5x10), two lock washers (5.1x9.3x1.3), and two flat washers (5.3x10x1.0).

9

Page 9
Image 9
Vision Fitness ST730 manual E P 1 Orange BAG, AT3 AT2 AT1