Vision Fitness ST730 manual Blue BAG

Models: ST730

1 28
Download 28 pages 33.03 Kb
Page 10
Image 10

S T E P 2

BLUE BAG

“Front” Sticker

AB1

AT1

With the weight stack tower (AB1) standing upright, slide it against the T-shaped bracket at the end of the main floor support (AT1) (with the “Front” sticker facing the rest of the machine). Line up the holes at the bottom of the weight stack tower with the holes in the main floor support. Secure the connection with two bolts (M10x70), four flat washers (10.2x22x2), and two nylon nuts (M10).

10

Page 10
Image 10
Vision Fitness ST730 manual Blue BAG