S T E P 6 Y E L L O W B A G

Q05Q06

Q01

Q03

Q02

AB1

Align holes in rear shield (Q01) with the holes in the brackets on the back side of the weight stack tower (AB1); secure using 10 bolts (M5x10). Take the left side shield (Q03) and repeat on front side of weight stack tower using six bolts (M5x10). Tighten interior brackets (B09 & B10). Attach right side shield (Q02) with six bolts (M5x10)

Place slip-on nuts over holes on the left upright of the weight stack tower (AB1). Snap two top covers (Q05 & Q06) together. With tallest point facing the rear of the machine, place the top covers on top of the weight stack tower and secure using six bolts (M5x15).

15

Page 15
Image 15
Vision Fitness ST760 manual E P 6 Y E L L O W B a G