Vision Fitness ST760 manual E P 5 B L a C K B a G

Models: ST760

1 28
Download 28 pages 11.48 Kb
Page 14
Image 14

S T E P 5 B L A C K B A G

A

J

H

I

G

B

With the loop end of the cable in your hand, guide it through hole in top of weight stack tower, and around pulleys A and B. Bring it down along the weight stack tower, through pulley C and around pulley D. Loosen or remove pulley D to be able to ensure cable is routed between the post and the pulley. Weave cable through swing arm pulleys, going through pulleys E, F, G, H, I, J. End at the main frame, securing the loop on the connecting bracket by sliding a flat washer (10.2x22x2) onto the bolt (M10x70). Slide a bushing onto bolt and put bolt through hole in main frame, through loop end of cable, and through other side of main frame. Slide another bushing and flat washer onto bolt and secure with a nylon nut (M10).

Remove nut on bolt end of cable and place the selector pin tether on bolt shaft. Thread the nut on the bolt end of the cable all the way to the head of the bolt. Thread the bolt into the header plate, making sure that there is a minimum of 0.5” of engagement. Secure by tightening nut onto header plate.

F

E

C

D

14

Page 14
Image 14
Vision Fitness ST760 manual E P 5 B L a C K B a G