S T E P 1

ORANGE BAG

 

NOTE: During assembly, it is recommended

 

to ensure that all bolts are in place and

 

partially threaded before completely

 

tightening any one bolt. During assembly

 

steps 1 thru 5, do not completely tighten

 

any bolts until completion of Step 5.

 

• Lay the main floor support (AC1) on the

 

ground, pulley brackets facing up. Place

 

the end opposite of the pulley brackets

 

against the side of the left floor support

 

(AC5). Align the main floor support holes

 

with the 3rd and 4th holes from the end of

 

the left floor support. Secure using two

 

bolts (M10x70), four flat washers

 

(10.2x22x2), and two nylon nuts (M10).

 

• Stand the weight stack tower (AB1)

 

upright and place the previously

 

assembled floor supports (AC1 & AC5) up

 

against holes in the tower. Slide three bolts

 

(M10x70) with three flat washers

 

(10.2x22x2) through the holes, securing

 

the bolts with three more flat washers and

AB1

three nylon nuts (M10).

 

 

• Attach two pulleys to weight stack using

 

a bolt (M10x46), two flat washers

 

(10.2x22x2), and a nylon nut (M10) for

 

each pulley.

AC1

AC5

11

Page 11
Image 11
Vision Fitness ST770 manual Partially threaded before completely