S T E P 4 GREEN BAG

• Slide the bracket of the arm pad support (AC2) over the left floor support (AC5), aligning the holes in both pieces. Make sure the pad plate is facing forward of the machine. See diagram for clarification. Secure using two bolts (M10x75), four flat washers (10.2x22x2), and two nylon nuts (M10).

• Place the connecting brace (AG2) between the arm pad support (AC2) and swing arm support (AC4), aligning holes on both sides. On the arm pad support side, use two bolts (M10x70), four flat washers (10.2x22x2), and two nylon nuts (M10) to secure. On the swing arm support side, use two bolts (M10x120), four more flat washers, and two more nylon nuts.

• Take the main seat support (AC3) and place over the remaining holes in the left floor support (AC5). Connect using four bolts (M10x75), eight flat washers (10.2x22x2), and four nylon nuts (M10).

AG2

AC2AC4

AC5

AC3

14

Page 14
Image 14
Vision Fitness ST770 manual E P 4 Green BAG