S T E P 3 | PINK BAG |
• Set the swing arm support (AC4) against the remaining holes in the side of the main floor support (AC1) and secure using two bolts (M10x70), four flat washers (10.2x22x2) and two nylon nuts (M10). Secure the connection in front of the weight stack with two bolts (M10x120), four flat washers (10.2x22x2), and two nylon nuts (M10).
• Place the dual pulley bracket (AG1) in between holes on the swing arm support (AC4) and the weight stack tower (AB1). Use two bolts (M10x120), four flat washers (10.2x22x2), and two nylon nuts (M10) to secure the swing arm support side of the bracket. Use two bolts (M10x140), four flat washers and two nylon nuts, respectively, to secure weight stack tower side.
AB1
AG1
AC4
M10x120
AC1
AC5
13