Vulcan-Hart EF4 ML-114943, EF5 ML-114944, EF3 ML-52099 service manual Thermopile

Models: EF3 ML-52099 EF4 ML-114943 EF5 ML-114944

1 16
Download 16 pages 62.77 Kb
Page 7
Image 7
THERMOPILE

6. Loosen the packing nut and the holding nut.

7. Remove the high limit bulb from the clamp.

8.Pull the high limit bulb through the underside of the fry tank and remove the high limit assembly.

9.Reverse the procedure to install. When installing the new high limit assembly, do not kink the high limit capillary. Wrap threads of packing nut with Teflon tape to prevent leakage.

THERMOPILE

WARNING: SHUT OFF THE GAS BEFORE SERVICING.

WARNING: ALL GAS JOINTS DISTURBED DURING SERVICING MUST BE CHECKED FOR LEAKS. CHECK WITH SOAP AND WATER SOLUTION (BUBBLES). DO NOT USE AN OPEN FLAME.

1.Remove heat shield as outlined under Cover and Panels.

2.Disconnect thermopile lead wires as outlined under High Limit.

3.Remove burners as outlined under Burners.

4.Remove pilot tubing from pilot.

5. Remove screws holding pilot bracket.

– 7 –

Page 7
Image 7
Vulcan-Hart EF4 ML-114943, EF5 ML-114944, EF3 ML-52099 service manual Thermopile