1.Bring conduit containing the proper supply wire to the fryer.
On VF1/VMF1 and VF1D/VMF1D, bring the conduit in through the clearance hole in the back and terminate on the terminal block housing mounted in the back of the breaker box.
On VF2 and VF2D, terminate the field supply conduit on the corner of the bottom floor and bring the supply leads into the breaker box through the removable channel mounted to the right side.
On VMF2 and VMF2D, bring the conduit through the opening in the bottom toward the front of the fryer.
2.Connect the supply leads to the field terminal block and the green grounding lead to the labeled ground lug.
Fryers wired for
ELECTRICAL DATA CHART
| TOTAL |
|
|
| NOMINAL AMPS PER LINE WIRE |
|
|
|
| ||||||||||
MODEL | K.W. | KW PER PHASE |
|
|
|
| 3 PHASE |
|
|
|
|
| 1 PHASE | ||||||
| CONN. | 208, 240 & 480 V. |
| 208 V. |
|
|
| 240 V. |
|
| 480 V. |
| 208 | 240 | 480 | ||||
|
| X | Y | Z | X |
| Y |
| Z | X | Y | Z |
| V. | V. | V. | |||
VF1/VMF1, | 12 | 3.8 | 3.8 | 4.2 | 34 | 33 | 34 | 29 |
| 28 |
| 29 | 15 | 14 | 15 | 58 | 50 | 25 | |
VF1D/VMF1D |
|
| |||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
VF2/VMF2, | 21.0 | 5.25 | 10.5 | 5.25 | 44 | 66 | 66 | 38 |
| 57 |
| 57 | 20 | 30 | 30 | 101 | 88 | 44 | |
VF2D/VMF2D |
|
| |||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LEVELING
Level floor model fryers. Place a carpenter's level on top of the fryer and turn the adjustable legs to level fryer
Countertop models must be placed on a level surface.
BEFORE FIRST USE
Clean fryer thoroughly, following procedures described in this manual under CLEANING — WEEKLY OR AS REQUIRED. Clean all fryer accessories. Rinse all parts thoroughly and wipe dry.
Lightly season backsplash area to avoid possible surface corrosion. With a soft,
— 4 —