![Top Section](/images/new-backgrounds/51222/5122219x1.webp)
Typical graduated end hinge with typical long stem tandem track roller
Intermediate I section
Left double graduated end hinge with typical long stem track roller
Vertical tracks
Right double graduated | Bottom section | |
|
| |
end hinge with typical |
|
|
long stem track roller |
|
|
(2) | ||
Left single |
| Right single |
graduated end |
| |
hinge with | Center | graduated end hinge |
typical short | with typical short | |
stem track roller | hinge(s) | stem track roller |
(2) | Upper hinge leaf | |
Lag screws |
Typical sections shown | Half center hinge |
|
Long strut (if applicable)
14 | Top Section |
Tools: Hammer, Step ladder, Tape measure |
Place the top section in the opening. Temporarily secure the top section by driving a nail into the header near the center of the door and bending it over the top section. Now, flip up the graduated end hinge and center hinge leaves, hold tight against section, and fasten center hinges first and end hinges last (refer to step, Stacking Sections). Vertical track alignment is critical. For 2” track, position flag angle/wall angle between
Flag angles/wall angles must be parallel to the door sections. Repeat same process for other side.
Important: The dimension between the flag angles must be:
For 2” track applications: door width plus
For 3” track applications: door width plus
Complete the vertical track installation by securing the jamb bracket(s) or slots in the wall angle and tightening the other lag screws. Push the vertical track against the track rollers so that the track rollers are touching the deepest part of the curved side of the track; tighten all the track bolts and nuts. Repeat for other side.
| Door width (2” Track) | Door width (3” Track) | |
Top of flag angle or | + | + | |
|
| ||
Top of wallangle assembly |
|
| |
2” Track Applications: | Nail |
| |
Top section | |||
3” Track Applications: |
|
| |
|
|
| Flag angle or |
| wallangle assembly |
| Top |
| section |
| Vertical track |
| against rollers |
15 | Horizontal Tracks |
Tools: Ratchet wrench, 7/16” Socket, 9/16” Socket, 9/16” Wrench, |
To install horizontal track, place the curved end over the top track roller of the top section. Align the bottom of the horizontal track with the top of the vertical track. Tighten the hori- zontal track to the flag angle/wall angle with (2)
WARNING
Do not raise door until horizontal tracks are secured at rear, as outlined in step, Rear Back Hangs, or door could fall from overhead position causing severe or fatal injury.
Level the horizontal track assembly and bolt the horizontal track angle to the first encoun- tered slot in the flag angle/wall angle using (1)
Remove the nail that was temporarily holding the top section in place, installed in step, Top Section.
Important: Failure to remove nail before attempting to raise door could cause permanent damage to top section.
Note: If an opener will be installed, position horizontal tracks slightly above level.
Horizontal | Vertival track Or Wall angle |
| |
track |
| ||
|
| ||
| Horizontal |
|
|
| track angle |
|
|
|
| ||
|
| Truss head bolt | |
Flange hex nuts |
|
| |
|
|
| |
| Horizontal |
| |
Flag angle | track |
| |
Track bolts |
| ||
|
|
| |
Flag angle |
| ||
Truss head bolt |
| ||
Hex nut |
| Hex nut |
|
|
|
| |
| Horizontal |
|
|
| track angle | Horizontal |
|
| Horizontal | track angle |
|
| track |
| |
Flag angle |
|
| |
|
| x 3/4” | |
|
|
| Truss |
|
| Horizontal | head |
|
| bolt | |
|
| track | |
|
|
|
16 | Adjusting Top Fixtures |
Tools: 7/16” Wrench, Step ladder |
With horizontal tracks installed, you can now adjust the top fixtures. Vertically align the top section of the door with the lower sections. Once aligned, position the top fixture slide(s) out against the horizontal track. Maintaining the slide(s) position, tighten the
10
Please Do Not Return This Product To The Store. Contact your local
refer to your local yellow pages business listings or go to the Find a Dealer section online at