STEEL | (2) 1/2” X 3” | |
SLEEVE ANCHOR | ||
(3) 5/16” X 1” |
|
|
AND TAPPING SCREWS | NOTE: MUST SECURE |
|
| SLEEVE ANCHORS TO |
|
| BUILDING FIRST , THEN |
|
| ATTACH BRACKETS TO |
|
| ANCHORS. |
|
FIG | FIG |
|
ONE or TWO SPRINGS (2” or |
| |
3” MINIMUM SPRING PAD WIDTH |
|
|
(6” IF FOR TROLLEY OPERATOR) |
| RIGHT HAND DRUM |
|
| BLACK |
| WINDING CONE |
|
| BLACK |
|
WINDING CONE |
|
|
RED |
|
|
LEFT HAND DRUM | CENTER SUPPORT BRACKET |
|
RED |
|
|
TWO SPRINGS |
| |
| RIGHT HAND DRUM | |
|
| BLACK |
| WINDING CONE |
|
| BLACK |
|
WINDING CONE |
|
|
RED |
|
|
LEFT HAND DRUM |
|
|
RED |
|
|
| 9” MINIMUM SPRING PAD WIDTH |
|
| NOTE: 6” SPRINGS UTILIZE SOLID SHAFTS | |
| FIG N |
|
10 |
|
|