BOTTOM SECTION/ VERTICAL TRACK
Center and level (or support to a known grade level) the bottom section in the opening, using shims if necessary, as seen in FIG H. Temporarily attach the wall angles to the jambs with the appropriate lag screws, as shown in FIG
NOTE: Products being installed to precast or block must use a 3/8” x 3” sleeve anchor to attach the wall angle to the building, as shown in FIG
Stack the bottom section into position by hooking the left hand roller into the left hand vertical track, as shown in FIG
|
| WALL ANGLE |
|
| 5/16” X 1 5/8” LAG |
| FIG | SCREW FOR USE ON |
|
| WOOD JAMBS. |
|
| FIG |
| FIG |
|
|
| 5/16” X 1” SELF |
| WALL ANGLE | DRILLING & |
13” |
| TAPPING SCREW |
| FOR USE ON STEEL | |
|
| |
|
| JAMBS. |
| FIG |
|
30” OR |
| |
18” |
| FIG |
|
| |
|
| 3/8” X 3” SLEEVE |
| VERTICAL TRACK | ANCHOR (BY |
| OTHERS) FOR USE | |
24” |
| |
| ON | |
O.C. |
| |
| CONCRETE. | |
MAX |
| |
| ( DRILL A | |
|
| |
|
| 3/8” X |
|
| HOLE) |
24” |
| FIG |
O.C. |
| |
MAX |
|
|
|
| STACK THE SECTION |
|
| INTO POSITION, BY |
|
| HOOKING THE LEFT |
24” |
| HAND ROLLER INTO |
| THE VERTICAL TRACK | |
|
| |
|
| AND REPEATING FOR |
| FIG | THE RIGHT HAND SIDE. |
|
| |
10” | NOTE: TYPICAL FASTENER SPACING. | FIG |
|
FIG H
STACKING SECTIONS
Locate the Lock Section (the second section) and insert a roller into the left end hinge. Stack this section into the opening by hooking the roller into the left hand vertical track and lowering the section onto the bottom section, as shown in FIG I. Insert a roller into the proper, uninstalled right hand end hinge, and place the roller into the right hand vertical track. Lower the roller and hinge into the proper position over the section, and attach to the section in the same manner the left hand end hinge was attached, as described on page 5. Verify section alignment, and flip up the upper hinge leaf(s) from the bottom section and secure to the lock section using
6