
15
Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your local
yellow pages business listings or go to the Find a Dealer section online at www.Wayne-Dalton.com
Tools Needed:
Tools Needed:
INSTALLATION
13 bottom Section
Center the bottom section in the door opening. 
Level section using wooden shims under the bottom 
astragal if necessary. hold the section in the opening 
while attaching vertical tracks.
Level
Wood Shims
Level
header
jamb
Bottom 
section
Wooden 
shims
Bottom 
section
5/16 X 1-5/8” 
Lag screws
Flagangle
Vertical track 
assembly
jamb
Bracket
Cable
vertical Track
3/16” Drill Bit
Power Drill
7/16” Socket Driver
Tape Measure
Level
Step Ladder
IMPORTANT: ThE TOPS OF ThE VERTICAL TRACkS 
MUST BE LEVEL FROM SIDE TO SIDE. IF ThE BOTTOM 
SECTION WAS ShIMMED TO LEVEL IT. ThE VERTICAL 
TRACk ON ThE ShIMMED SIDE, MUST BE RAISED 
ThE hEIGhT OF ThE ShIM. 
Position the left hand vertical track assembly over 
the rollers of the bottom section. Make sure the 
counterbalance cable is located between the rollers 
and the door jamb. Drill 3/16” pilot holes for the lag 
screws.
Loosely fasten jamb brackets and flagangle to the 
jamb using 5/16” x 1-5/8” lag screws. Tighten lag 
screw securing bottom jamb bracket to jamb, to 
maintain 5/8” spacing. hang counterbalance cable 
over flagangle. 
Repeat for the right hand side.
Bottom section
Vertical 
track
Roller
5/8”
F.A.T. FLAGANGLE
5/16” x 1-5/8” 
Lag screw
jamb bracket
Lag 
screw 
Locations
Weather 
seal
q.I. FLAGANGLE
Lag 
screw 
Locations