12

6

a.

 

ASSEMBLY

 

CAUTION: Use two people to lift and install the Summit® Built-In frame assembly.

a.)

Lift the frame assembly into the “island” structure opening. Make sure the frame is resting level on the fi nished surface of

 

the structure.

b.)

Adjust the Front Vent to rest squarely on ground.

c.)

Apply a bead of silicone sealant (1) around the perimeter and front edges of the grill that are in contact with the “island”

 

structure. This will prevent moisture seepage. The sealant you use must have a temperature rating above 120°F (48.8° C).

Any Surface

24 inches (610mm)

 

Note: For a countertop treatment

 

 

 

 

 

inches24 (610mm)

Recommended 3/4 inch (19.1 mm)

(610mm)

24inches

overhang. Notch front edge for

 

 

 

frame to fully slide in.

Frame

c.

Any Surface

(1)

24 inches (610mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

inches24 (610mm)

 

 

Frame

 

 

 

(610mm)

24inches

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

b.

Page 12
Image 12
Weber 42370 dimensions Structure