Install Flavorizer® Bars and Cooking Grates

Installing the warming rack

You will need: five Flavorizer Bars and two cooking

You will need: warming rack.

grates.

Set the warming rack into the slots at the rear of the

Place the Flavorizer Bars side by side in the cooking

cooking box.

box.

 

Set the cooking grates onto the ledges in the cooking box with the rounded sides up.

Install the thermometer

You will need: Thermometer.

Insert the thermometer into its holder on the right side of the lid.

®

®

Installing the Warm-Up™ Basket

 

Install the bottom shelf

 

 

 

You will need: Bottom shelf.

 

You will need: Warm-Up Basket

 

 

Set the bottom shelf in place between the two frame

Insert one end of the Weber Warm-Up Basket into the

 

 

 

connectors underneath the cooking box.

hole at the right side of the inside of the lid, and the

 

 

 

 

 

 

 

 

other end into the slot at the left side of the lid.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

C-8

Page 25
Image 25
Weber Liquid Propane Grill, 55052 0100 manual Install the thermometer, You will need Thermometer, You will need Bottom shelf