5.Attach the Lower Lat Tower (46) to the Lat Base (48) with two M8 x 68mm Bolts (1) and two M8 Nylon Locknuts (11). Do not tighten the Nylon
Locknuts yet.
Attach the Lower Lat Tower (46) to the Crossbrace
(47)with two M8 x 68mm Bolts (1), two M8 Washers (15), and two M8 Nylon Locknuts.
Tighten all Nylon Locknuts used in steps 1–5 now.
6.Press two 60mm Square Bushings (20) into the Weight Carriage (56). Press two 25mm Round Inner Caps (23) into the Weight Carriage.
Press a 60mm Square Bushing (20) into the Carriage Stop (55). The slot in the Square
Bushing must be aligned with the indicated hole in the Carriage Stop.
7.Slide the Weight Carriage (56) onto the Upper Lat Tower (41). The Weight Carraige must be orient- ed as shown.
Slide the Carriage Stop (55) onto the Upper Lat Tower (41). The 60mm Square Bushing (20) must be facing toward the Weight Carriage (56). Attach the Carriage Stop to the Upper Lat Tower with an M8 x 68mm Bolt (1) and an M8 Nylon Locknut (11).
7
5 |
| |
46 | 1 | |
| ||
1 |
| |
1 | 47 | |
48 | 15 | |
1 | ||
| ||
6 |
| |
20 | 23 | |
| 56 | |
23 |
| |
| 20 | |
20 |
| |
| Align the Slot | |
55 | and the Hole | |
| ||
7 |
| |
| 41 | |
| 56 | |
1 | 20 | |
55 |
| |
| 11 |