20.Attach a 3 1/2” Pulley (89) inside of the hole in the Front Leg (31) with a 3/8” x 3 1/2” Bolt (90), two 1” Spacers (35), two 3/8” SAE Washers (75), and a 3/8” Nylon Jamnut (92). Make sure the

Pulley is above the Leg Lever Cable (62). Slide the two free ends of the Leg Lever Cable

(62)onto the hook welded to the bottom of the Bench Rail (23).

21.Slide two Foam Pads (28) onto the tube on the Front Leg (31). Press two 3/4” Round Inner Caps

(33)into the ends of the tube.

Repeat this step with the Leg Lever (32).

22.Wrap a Short Cable (60) over a 3 1/2” Pulley

(89).Attach the Pulley to a High Pulley Housing

(52)with a 3/8” x 1 3/4” Button Bolt (25) and a 3/8” Nylon Locknut (73).

Repeat this step with the other Short Cable

(60) and High Pulley Housing (52).

23.Adjust the tension on the upper cable (not shown) as described in UPPER CABLE ADJUSTMENT on the following page.

20

 

 

 

90

75

 

 

 

35

23

 

 

 

 

 

 

62

 

 

 

89

 

 

 

75

 

31

 

35

 

 

 

 

 

 

92

21

 

 

 

33

28

 

 

 

31

 

 

 

 

28

 

 

 

33

 

32

 

 

22

 

 

 

 

 

73

52

 

 

 

 

 

 

25

 

 

60

 

 

 

89

 

24.Make sure that all parts have been properly tightened. The use of the remaining parts will be explained in ADJUSTMENTS, beginning on page 15.

Before using the resistance system, pull the long cable a few times to be sure that it moves smoothly over the pulleys. If the cable does not move smoothly, find and correct the problem. IMPORTANT: If the cables are not properly installed, they may be damaged when heavy resistance is used. See the CABLE DIAGRAM on page 18 for proper cable routing.

13

Page 13
Image 13
Weider 831.153991 user manual Repeat this step with the Leg Lever