CABLE ASSEMBLY

19. Slide a Cable Trap (66) and a 3 1/2” Pulley

19

 

66

(15) onto each 3/8” x 3 3/4” Bolt (68). Insert

 

42

 

the Bolts into the Front Upright (42) from the

 

 

 

 

68

direction shown. Hand tighten a 3/8” Nylon

 

 

 

15

 

Locknut (21) with a 3/8” Flat Washer (9) onto

 

 

 

9

 

each Bolt. Be sure that all parts are orient-

 

 

 

 

 

ed as shown. Do not tighten the Nylon

 

 

 

Locknuts yet.

 

 

15

 

 

 

 

21

 

 

20. Route the Short Cable (23) around the 3 1/2”

20

 

42

Pulley (15) attached to the lower hole in the

 

 

 

42

 

15

Front Upright (42). See the inset drawing.

 

Be sure that the Cable Trap (66) is turned

15

 

68

to hold the Cable in place and that the

 

 

 

 

Cable is routed around the Pulley as

21

 

 

shown. Tighten the 3/8” Nylon Locknut (21)

 

66

 

 

and the 3/8” x 3 3/4” Bolt (68).

 

23

23

 

 

 

 

 

Inset shows view

 

 

 

from other side

21. Route the Short Cable (23) up around the

21

 

42

3 1/2” Pulley (15) attached to the upper hole

 

 

 

in the Press Frame (17). Be sure that the

 

 

15

Cable Trap (66) is turned to hold the Cable

 

 

 

in place and that the Cable is routed

 

 

 

around the Pulley as shown.

 

 

 

Next, route the Short Cable (23) around the

 

 

66

 

 

23

3 1/2” Pulley (15) attached to the upper hole

 

42

 

 

in the Front Upright (42). Refer to the inset

 

 

Inset shows view

drawing. Be sure that the Cable Trap (66)

 

 

 

 

from other side

is turned to hold the Cable in place and

 

 

 

 

 

that the Cable is routed around the Pulley

 

 

23

(15) as shown.

 

 

 

 

 

 

15

 

15

 

 

66

 

 

 

 

 

 

21

 

 

 

17

11

Page 11
Image 11
Weider WESY16010 user manual Inset shows view, From other side