11.Grease an M10 x 51mm Bolt (66). Attach a Cable Pivot (39) to the Left Arm (10) with the Bolt and an M10 Nylon Locknut (56). Do not overtighten the Locknut; the Cable Pivot must be able to pivot easily.
Wet the inside of a Large Foam Pad (42) with soapy water. Slide the Large Foam Pad onto the Left Arm (10).
Attach a Handle (11) to the Left Arm (10) with two M10 x 25mm Button Bolts (77) and two M10 Washers (57).
Assemble the Right Arm (9) in the same manner.
12.Grease an M10 x 85mm Bolt (67) and two Arm Bushings (44). Attach the Right Arm (9) to the Pivot Frame (5) with the Bolt, two M10 Washers (57), the two Arm Bushings, and an M10 Nylon Locknut (56). Do not overtighten the Locknut; the Arm must be able to pivot easily.
Attach the Left Arm (10) to the Pivot Frame (5) in the same manner.
Cable Assembly
13.Refer to the CABLE DIAGRAMS on page 20 as you assemble the cables and to identify the cables.
Locate the Arm Cable (54). Grease an M8 x 22mm Shoulder Bolt (65). Attach the Cable to the indicated Cable Pivot (39) with the Bolt and an M8 Nylon Locknut (58).
11 | 66 | Grease |
9 | ||
|
| 39 |
| 56 | 10 |
|
| |
| 11 | 42 |
|
| |
|
| 57 |
|
| 77 |
|
| 57 |
12 |
|
|
| Grease |
|
| 9 |
|
| 67 | 5 |
|
| |
| 44 |
|
| 57 |
|
| Grease |
|
| 57 | |
| 56 |
|
|
| 10 |
13 |
|
|
| 58 | 39 |
|
| 54 |
|
| Grease |
|
| 65 |
10