22.Route the Low Cable (53) under a 90mm Pulley (48). Attach the Pulley and two Half Finger Guards (43) to the Base (1) with an M10 x 46mm Bolt (81) and an M10 Nylon Locknut (56). Make sure the Finger Guards are on the outside of the bracket as shown.

23.Attach the Low Cable (53) to the “U”-bracket (45) with an M8 Washer (59) an an M8 Nylon Locknut (58). See the inset drawing. Do not overtighten the Nylon Locknut; it should be threaded onto the end of the Cable so that only two threads are showing above the nut.

24.Locate the High Cable (55). Route the Cable up through the Top Frame (4) and over a 90mm Pulley (48). Attach the Pulley inside of the Top Frame with an M10 x 67mm Bolt (71), two M10 Washers (57), two 12mm Spacers (52), and an M10 Nylon Locknut (56).

25.Route the High Cable (55) over a 90mm Thin Pulley (47) and down through the Top Frame (4). Attach the Pulley inside of the Top Frame with an M10 x 67mm Bolt (71), an M10 Washer (57), and an 11mm Spacer (49). Make sure that the

Pulley does not fall out of the Top Frame while completing steps 26 and 27.

22

56 43

53

48

 

 

81

1

43

 

23

45

 

58

58

59

53

 

45

53

 

24

 

 

55

 

4

57

48

56

52

52

 

71

 

57

25

47

55 4

49 57 71

13

Page 13
Image 13
Weider WESY19541 user manual 49 57