11.Insert the Resistance Bar (9) between the Crossbar Guides (15), and center it on the Crossbar Block (not shown).
Press a Pulley Bracket (10) onto the Resistance Bar (9). Screw a 3/8” x 38mm Tension Screw (59) into the Pulley Bracket a couple of turns. Make sure the hexagonal hole in the Screw is on the outside of the Bracket.
Attach a Tether (70) to the Pulley Bracket (10) at the upper hole, with an M10 x 64mm Button Bolt (80), an M10 Thick Washer (54), and an M10 Nylon Locknut (103).
Repeat on the other side of the Resistance Bar (9). Then, tighten the lower M10 x 152mm Bolt (86) used in step 10.
12.Hold a Large Pulley (14) inside of the Upper Cable (115). Attach the Pulley to a Pulley Bracket (10) with an M12 x 58mm Button Bolt (87) and an M12 Nylon Locknut (13). Make sure that the cable is routed as shown in the CABLE DIA- GRAM on page 18.
13.Hold a Large Pulley (14) inside of the Upper Cable (115). Attach the Pulley to the other Pulley Bracket (10) with an M12 x 58mm Button Bolt (87) and an M12 Nylon Locknut (13). Make sure that the cable is routed as shown in the CABLE DIAGRAM on page 18.
Tighten the two 3/8” x 38mm Tension Screws
(59) an equal number of turns.
14.Attach the Leg Lever (56) to the Leg (5) with a Leg Station Pin (60). Slide a Cotter Pin (138) onto the Leg Station Pin.
11 |
|
|
15 |
| 70 |
|
| |
|
| 103 |
| 9 | 54 |
|
| |
|
| 10 |
|
| 80 |
|
| 59 |
12 |
|
|
13 |
|
|
10 |
|
|
87 |
|
|
14 |
|
|
115 |
|
|
13 |
|
|
|
| 13 |
115 |
| 59 |
| 10 | |
|
| |
87 |
| 14 |
14 |
|
|
5 |
|
|
56 |
| 138 |
|
| |
|
| 60 |
10