CABLE ASSEMBLY

22. Locate the Medium Cable (58). Route the

22

 

 

Medium Cable (58) under the 3 1/2Ó Pulley

 

 

 

 

 

(15) attached to the bracket on the Press

 

 

 

Frame (17). Be sure that the end of the

 

 

17

Cable with the ball is on the indicated side

 

 

of the Press Frame and that the Cable is

 

 

15

between the Pulley and the crossbar on

 

 

 

 

 

the Press Frame.

 

 

Ball

 

58

 

Crossbar

 

 

 

 

 

21

 

23. Route the Medium Cable (58) around the

23

 

42

3 1/2Ó Pulley (15) attached to the lower hole

 

42

 

 

15

in the Front Upright (42). See the inset draw-

 

 

 

 

 

ing. Be sure that the Cable Trap (66) is

15

 

71

turned to hold the Cable in place and that

 

 

 

 

 

 

the Cable is routed around the Pulley as

 

 

 

shown. Tighten the 3/8Ó Nylon Locknut (21)

 

58

66

and the 3/8Ó x 3 3/4Ó Bolt (71).

 

58

 

 

 

 

21

 

Inset shows view

 

 

 

 

 

 

from other side

24. Route the Medium Cable (58) around the

24

 

 

3 1/2Ó Pulley (15) attached to the upper hole

 

 

 

 

 

in the Press Frame (17). Be sure that the

 

 

58

Cable Trap (66) is turned to hold the Cable

 

 

 

 

 

in place and that the Cable is routed

 

 

15

around the Pulley as shown. Make sure the

 

 

 

3/8Ó Nylon Locknut (21) and the 3/8Ó x 3 1/2Ó

 

 

66

Bolt (not shown) are tight.

 

 

21

 

 

 

 

 

 

17

25. Route the Medium Cable (58) around the

25

 

42

3 1/2Ó Pulley (15) attached to the upper hole

 

58

 

15

in the Front Upright (42). See the inset draw-

 

 

 

 

ing. Be sure that the Cable Trap (66) is

15

 

71

turned to hold the Cable in place and that

 

42

 

 

the Cable is routed around the Pulley as

 

 

shown. Tighten the 3/8Ó Nylon Locknut (21)

 

 

66

and the 3/8Ó x 3 3/4Ó Bolt (71).

21

 

58

 

 

 

Inset shows view

 

 

 

from other side

12

Page 12
Image 12
Weider XR20 user manual Locate the Medium Cable 58. Route, Inset shows view, From other side