CABLE ASSEMBLY

15. Route the Long Cable (23) around a ÒVÓ-

15

 

50

7

Pulley (6). Using a 3/8Ó x 2 1/2Ó Bolt (7) and a

 

 

 

6

3/8Ó Nylon Locknut (21), attach the ÒVÓ-Pulley

 

 

 

 

 

 

 

(6) and a Long Cable Trap (50) to the Right

 

 

 

 

Arm (48). Be sure that the Cable is in the

 

 

 

 

groove of the Pulley and that the Long

 

 

 

 

Cable Trap (50) is positioned to hold the

 

 

 

 

Cable in place.

 

 

 

21

 

 

 

 

 

 

23

48

 

 

 

 

 

16. See the inset drawing. Using a 5/16Ó x 5Ó

16

68

66

 

Bolt (68) and a 5/16Ó Nylon Locknut (3),

 

 

 

 

 

attach the Pulley Bracket (20) to the indicated

 

 

 

 

bracket on the Top Frame (55). Note: The

 

 

 

 

Pulley Bracket is pre-assembled with a 3

 

20

 

 

1/2Ó Pulley (15) and a Cable Trap (66).

 

 

 

 

Route the Long Cable (23) around the 3 1/2Ó

 

 

15

 

Pulley (15) attached to the Pulley Bracket

 

 

68

 

 

 

(20). Be sure that the Cable is in the

 

23

 

 

 

55

groove of the Pulley and that the Cable

 

 

 

 

Trap (66) is turned to hold the Cable in

 

 

 

 

place. Make sure that the 5/16Ó x 5Ó Bolt (68)

 

 

 

20

is properly tightened and that the Pulley

 

 

 

Bracket (20) can move freely.

 

 

 

3

17. Remove the 3 1/2Ó Pulley (15) from the pre-

17

 

 

 

assembled Long ÒUÓ Bracket (57). See the

 

 

 

 

 

 

 

inset drawing. Wrap the Long Cable (23)

 

 

 

 

around the Pulley in the direction shown.

 

 

 

 

Attach the Pulley (15) and a Cable Trap (66)

 

 

 

 

to the indicated hole in the Long ÒUÓ Bracket

 

23

 

23

(57) with a 3/8Ó x 2Ó Bolt (12) and a 3/8Ó

 

 

 

 

 

Nylon Locknut (21). Be sure that the Cable

 

15

 

 

is in the groove of the Pulley and that the

 

 

 

 

66

 

 

Cable and Pulley move smoothly.

 

12

 

 

 

 

 

 

 

 

21

 

 

 

 

57

 

 

18. Wrap the Long Cable (23) around a 3 1/2Ó

18

 

23

15

Pulley (15). Using a 3/8Ó x 1 3/4Ó Bolt (85)

 

 

 

and a 3/8Ó Nylon Locknut (21), attach the

 

Bracket

85

Pulley to the indicated bracket on the Top

 

 

 

 

Frame (55). Be sure that the Cable is in the

 

 

 

 

groove of the Pulley and that the Cable

 

55

 

 

and Pulley move smoothly.

 

 

 

 

 

 

 

 

 

21

 

 

10

Page 10
Image 10
Weider XR20 user manual Cable Assembly