CABLE ASSEMBLY
11.During steps 11 through 27, refer to the CABLE DIAGRAM on page 21 of this manual to verify proper cable routing. Before begin- ning this section, identify the Long Cable (23), the Medium Cable (58), and the Short Cable (35) by comparing the lengths and ends of the cables.
IMPORTANT: While assembling the cables, do not overtighten the bolts and nuts attaching the pulleys. The pulleys must be able to turn freely.
12.Locate the Long Cable (23). Route the Long Cable around a 3 1/2Ó Pulley (15).
Using a 3/8Ó x 3 1/2Ó Bolt (16) and a 3/8Ó Nylon Jam Nut (67), attach the 3 1/2Ó Pulley
(15)to the Top Frame (55). Be sure that the end of the Cable with the ball is on the indicated side of the Pulley and that the Cable is between the Pulley and the hook on the Top Frame.
13.Wrap the Long Cable (23) around a
(6).Attach the
14.Route the Long Cable (23) around a ÒVÓ- Pulley (6). Using a 3/8Ó x 2 1/2Ó Bolt (7) and a 3/8Ó Nylon Locknut (21), attach the
(6) and a Long Cable Trap (50) to the Left Arm (47). Be sure that the Cable is in the groove of the Pulley and that the Long Cable Trap (50) is positioned to hold the Cable in place.
9
11 |
|
|
|
23 |
|
|
|
58 |
|
|
|
35 |
|
|
|
12 |
|
| 23 |
67 |
|
| |
55 |
|
| |
|
|
| |
Ball | 15 |
|
|
| 16 |
| |
| Hook |
| |
|
|
| |
13 |
| 7 |
|
|
|
| |
|
| 6 | 50 |
|
| 42 |
|
|
|
| 23 |
|
| 21 |
|
14 |
| 7 |
|
|
| 50 | |
|
| 6 | |
|
|
| |
| 23 | 21 |
|
| 47 |
| |
|
|
|