GOLD CGs Gas-Fired Water Boiler — Boiler Manual

11d Troubleshooting — control module lights (cont.)

CHART 5 FLAME light flashing and POWER light on steady

ALSO — Troubleshooting failure to establish main flame

Electrical shock hazard — Wherever you see TURN OFF POWER , follow the instructions. Failure to follow instructions could result in severe personal injury, death or substantial property damage.

 

• Are main manual shutoff valve and boiler gas valve open?

 

 

 

 

 

 

 

Is pilot flame visible through inspection port?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

No

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Yes

 

 

 

 

 

 

 

No

 

 

 

Yes

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TURN OFF POWER to boiler at service switch or breaker.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

• Open main manual shutoff valve and boiler gas valve (per

 

 

 

 

 

 

 

• Check the voltage across

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

terminals "C" and "A" of the

 

 

Make sure ground wire

 

 

Lighting instructions in this manual). Wait at least 45

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

gas valve (see Table G,

 

 

 

terminal is securely fastened

 

 

seconds.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

page 33).

 

 

 

 

 

 

 

 

 

to control module mounting

 

 

• Turn on power at service switch or breaker. Allow boiler to

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

screw.

 

 

 

 

cycle.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Is 24 VAC present there?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Does FLAME light flash now?

 

 

 

 

 

 

 

 

Yes

 

 

No

 

 

 

 

 

 

 

 

 

 

 

No

 

 

 

 

 

 

 

 

 

 

 

 

Yes

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

• Check the voltage across

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

• Boiler should be in

 

• Verify inlet gas pressure at gas

 

 

 

 

 

 

 

If the wiring from the

 

 

 

 

 

terminals "B" and "A" (see

 

 

 

 

valve:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

control module to gas

 

 

 

 

 

Table G, page 33) of the

 

 

normal operating

 

 

Natural gas — 5.0" w.c. min/14.0"

 

 

 

 

 

 

 

valve is intact, replace the

 

 

 

 

 

gas valve.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

sequence.

 

 

w.c. max

 

 

 

 

 

 

 

 

control module.

 

 

 

 

 

Is 24 VAC present there?

 

 

• Observe operation

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Retest.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Propane — 11.0" w.c. min/14.0"

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

No

 

 

 

Yes

 

 

until thermostat is

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

w.c. max

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

satisfied and blower

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

has completed its

 

 

Is gas present at gas valve inlet and

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

post-purge cycle.

 

 

 

 

 

 

 

 

within above range?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

• Verify inlet gas pressure at gas valve:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Yes

 

 

 

 

No

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Natural gas — 5.0" w.c. min/14.0" w.c. max

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Propane — 11.0" w.c. min/14.0" w.c. max

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TURN OFF POWERto

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Is gas present at gas valve inlet and within above range?

 

 

boiler at service switch or

 

 

 

 

 

Contact gas supplier to correct

 

 

 

 

 

 

 

breaker.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

No

 

 

 

 

Yes

 

 

 

 

• Remove air inlet box top

 

 

 

 

 

 

 

pressure or gas supply.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(see Figure 27, page 56 for

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

location).

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TURN OFF POWERto boiler

 

 

 

 

TURN OFF POWERto boiler at service switch or breaker.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Check flame signal — Detach sense lead from igntion control

 

 

• Verify pilot gas line is not

 

 

 

 

 

 

 

at service switch or breaker.

 

 

 

 

 

 

kinked, obstructed or damaged

 

 

• Remove air inlet box cover (see

 

 

 

 

 

(Figure 25, item 8, page 46).

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

and is correctly attached to

 

 

 

 

 

 

 

 

Connect negative lead of MICROAMMETER to control sense

 

 

 

 

 

 

 

 

 

Figure 27, page 56 for location).

 

 

 

 

 

 

pilot and gas valve.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

terminal (Figure 25, item 8, page 46). Connect positive lead of

 

 

• Verify pilot ignition electrode,

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MICROAMMETER to sense wire.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

electrode ceramic and spark

 

 

 

 

 

Verify pilot burner is securely

 

 

 

 

DISCONNECT red wire connected to terminal "B" (see Table

 

 

lead wire from control are in

 

 

 

 

 

 

 

attached to pilot bracket, bracket is

 

 

 

 

 

G, page 33) of the gas valve.

 

 

 

 

 

 

 

 

good condition. Spark gap

 

 

 

 

 

 

 

securely attached to cross tie, and

 

 

 

 

Turn on power to boiler and allow to cycle. As soon as pilot is

 

 

should be approximately 1/8".

 

 

 

 

 

there is no corrosion on the parts

 

 

 

 

 

burning, the MICROAMMETER should read at least 1.0

 

 

• Correct any above problems,

 

 

 

 

 

 

 

which would affect the ground path

 

 

 

 

 

microamp.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

replacing pilot if burner or

 

 

 

 

 

 

 

for flame sense.

 

 

 

 

 

 

 

Is flame signal at least 1.0 microamp?

 

 

 

 

wiring is damaged.

 

 

 

 

 

Verify that pilot flame rod, flame rod

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

No

 

 

 

 

Yes

 

 

 

 

• Reinstall air box top to operate

 

 

 

 

 

 

ceramic and lead wire from control

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

boiler for retest after any

 

 

 

 

 

 

 

module to flame rod are in good

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

changes or corrections.

 

 

 

 

 

 

 

condition.

 

 

 

 

If none of the previous steps

 

• If the wiring from the

 

 

• If none of the above corrects

 

 

 

 

 

Correct any above problems,

 

 

 

 

 

(including replacing pilot)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

control module to gas

 

 

problem, then replace the

 

 

 

 

 

 

 

replacing pilot if burner or wiring is

 

 

 

 

 

corrects problem, then replace

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

valve is intact, replace the

 

 

control module, reinstall air box

 

 

 

 

 

 

damaged.

 

 

 

 

 

the control module, reinstall air

 

 

 

 

 

 

 

 

 

 

 

 

 

 

control module and retest.

 

 

top, and retest.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

box cover and retest.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Part number 550-110-260/0508

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

51

Page 51
Image 51
Weil-McLain 550-110-260/0508 manual Item 8

550-110-260/0508 specifications

Weil-McLain is a well-known name in the heating industry, offering a wide range of high-quality boilers and heating systems. Among its impressive lineup, the Weil-McLain 550-110-260/0508 model stands out for its performance, efficiency, and advanced technologies, making it suitable for residential and commercial heating applications.

The 550-110-260/0508 boiler is designed for flexibility and performance, providing an output capacity of 110,000 BTU per hour. This makes it suitable for various heating needs, from single family homes to larger commercial spaces. One of the key features of this model is its high-efficiency design, which allows it to operate at an AFUE (Annual Fuel Utilization Efficiency) rating of up to 95%. This means that a significant portion of the fuel consumed is converted into usable heat, resulting in lower energy bills and reduced environmental impact.

A standout characteristic of the Weil-McLain 550-110-260/0508 is its durable construction. Built with high-quality materials, this boiler is designed to withstand the rigors of daily use and provide reliable service over the years. Additionally, the unit features a compact design, allowing for easy installation in various configurations, whether it be in a basement, utility room, or outdoor setting.

Another impressive technology incorporated in this model is the advanced control system, which allows for precise temperature management and improved energy efficiency. The intuitive control interface enables homeowners and facility managers to easily set and adjust heating schedules, ensuring optimal comfort while minimizing energy consumption.

Safety is also a top priority for Weil-McLain. The 550-110-260/0508 is equipped with multiple safety features, including a pressure relief valve, limit controls, and a low water cutoff, which help to ensure safe and reliable operation.

In conclusion, the Weil-McLain 550-110-260/0508 model boasts a combination of efficient heating, durable construction, advanced control technology, and safety features, making it an excellent choice for those seeking a reliable and effective heating solution. Its versatility and performance make it well-suited for a variety of applications in both residential and commercial settings.