1 | EG, PEG, EGH |
|
Installation (continued)
Figure 3
Hydrostatic pressure test
Pressure test before attaching gas piping or electrical supply.
1.Plug any necessary boiler tappings or openings.
2.Do not use gauge supplied with boiler for pressure testing. Install gauge with appropriate range.
3. Fill boiler with water.Vent all air. Test steam boilers between 45 - 55 psi and water boilers at
Installation of flue collector hood
(Factory installed on PEG boilers)
Set flue collector hood on boiler as shown in Figure 4. Use boiler cement furnished to provide
Failure to maintain
|
|
| Do not leave boiler unattended. A cold water fill could expand Figure 4 | Flue collector hood |
|
|
| and cause excessive pressure, resulting in severe personal injury, |
|
|
| |||
|
|
| death or substantial property damage. |
|
4. Check for maintained gauge pressure and leaks. Repair if found. |
| |||
|
|
| Leaks must be repaired at once. Failure to do so can cause boiler |
|
|
|
| ||
|
|
| damage, resulting in substantial property damage. |
|
|
|
| ||
|
|
| Do not use |
|
|
|
|
| |
|
|
| Severe damage to boiler will result, causing substantial property |
|
|
|
|
| |
|
|
| damage. |
|
5.Drain boiler and repair leaks if found.
6.Retest boiler after repairing leaks.
7.Removeplugsfromanytappings that will beusedforcontrols and accessories. Refer to control tapping table and Figure 3.
8.On initial
Installation of front and back base panels
See Figure 5 for installation. Fasten front (6 1/8 inch) and back 7 5/16 inch) base panels to sections. Seal with boiler cement along top of insulation panels.
Failure to maintain
6 | Part Number |